Progress
Thursday:
The installer/carpenter returned to begin installing the cabinets, which were clogging our living room, as well as the range hood. We pointed out the damage to the wood frame of the old vent flap door and left him mulling the options.
Friday:
The installer returned to continue work on the cabinets. He assured us that the misaligned doors would be adjusted appropriately once he was through. He arrived with a couple of pieces of vinyl siding, which he used to close up the portion of the vent opening not used by the new duct work. When we got home the doors had in fact been aligned, the cabinets were in place, and everything looks ready for the countertop templating on Monday. There was one finished side panel missing from the cabinet shipment, so the installer will return to install that and the crown molding in a couple of weeks or so. We think the kitchen is already wonderful, although working appliances would certainly make it even better!